October 26, 2012 @ 4:06 PM

The construction of the Delphin palapas is now underway.  Our crew has removed the old and began the construction of a much better design to match those at the other buildings.

The concrete columns have been poured and will be finished in short order. Using our own employees has saved us considerable expense on this project.

Also included here is a photo of the sample installation of a gorgeous see thru railing.  More photos and info on costs and options on this proposal coming soon!

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Read More