Just a quick update on some projects our management team is working on:
Cool Decking
- Work has been contracted out.
- Repairs to begin February 25 for Grande and Clubhouse areas.
- Completion in one week.
Jacuzzis / Pool
- Jacuzzis that had defective jets are being replaced.
- Electric timers and broken switches replaced as necessary.
- All parts ordered and repairs to be completed in time for Spring Break.
- Broken, missing tiles replacement underway in all spas and pools.
- Pads for chaise lounge chairs have been ordered.
Earthquake Damage
- Damage to the stucco on top corner of the Bonita Building caused by last years tremor.
- Damage is NOT structural.
- Insurance Claim has been accepted and we expect a settlement check for $2,000.
- Repairs to begin ASAP.
Signage
- Obtaining price quotes and designs for front of Clubhouse.
- Proposal to put a sign on top of Delphin Building for street visibility.
- Perimeter wall by guard shack to be painted "WELCOME TO LAS PALMAS'
- Front entrance fountain & sign has been spruced up. The dolphin statutes have been refurbished and oxidation removed. Monthly maintenance schedule now in place to keep pumps in operating condition and statue polished.
CATV System
- Six replacement HD ready satellite recievers have been installed.
- No more daily resets required for continious viewing in the wee am hours.
- Ready for HD expansion when budget permits.
- Channel lineup can be found by clicking here.
Tennant Improvements
- Chef Jose will be opening and operating a Sundry Store next to the restaurant.
- Separate entrance door has been placed in outside wall
- Reviewing proposals for a vendor to occupy exercise room which would have to be moved upstairs.
- Board to review these proposals very carefully, as to viability, types of use, etc.
Arizona & Sonora Governors Meeting
Our Board President, Dan Dimovski, attended the Arizona & Sonora Governors Conference on February 10. Dan indicates it was a very productive meeting and he will be submitting his report shortly.
Water Filter Plant / Machine Room
Many owners may not be aware of our onsite water treatment plant. This facility has been completely cleaned up and all maintenance performed. It is no longer used for storage or as a work area, and is now freshly painted, sparkling clean and kept under lock & key.
Our system is state of the art utilizing a high power red laser to further purify and kill any bacteria in our incoming city water. It is then filtered and softened. From there it is pumped into a holding tank for each building. It is a redundant system with four high power pumps that kick in as water demand necessitates.
In addition, the facility includes our fire protection master control system, and sprinkler pumps.
See the attached photos, for it is a facility we can be proud of.